44 |
P a g e
STEP 7.5
ANNEX ROOF INSTALATION
7.5 - ASSEMBLY PARTS
–
ANNEX ROOF INSTALLATION
PART CODE QTY
DESCRIPTION
VP
2
Veranda Posts 2400x90x90mm
100BS
6
100mm batten screw
200PB
4
200mm M12 Post Bolt
W
8
M12 Washer
7.5
- ASSEMBLY
–
ANNEX ROOF INSTALLATION
1. Using at least 3 people, butt the veranda roof hard up under shed roof as seen below. Support
front of veranda roof while fastening through frame into shed wall studs, using 4x 100BS.
2. If installing on dirt*- dig holes and place posts in ground as seen in diagram on previous page
(using concrete if you wish).
3. Once veranda frame is at desired height, screw through front beam into posts using 1x 100BS
to hold posts in desired position** (
ENSURE THERE IS 30mm FALL DOWN FROM SHED TO FRONT
OF VERANDA ROOF).
4. Once posts are level in the desired position and veranda frame has
30mm of fall
, predrill holes
(using a 13mm drill bit) and secure posts to VOB with 2x 200PB and 4x W.
* If installing on concrete pad, use brackets and dyno bolt into place (fasteners not supplied).
** Fasten frame to posts once roughly the right height and then critique by hammering in or
adding dirt (or concrete) till there is precisely
30mm fall from shed.
Summary of Contents for Bromley
Page 44: ...43 P a g e ...
Page 47: ...46 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...
Page 51: ...50 P a g e ...
Page 52: ...51 P a g e ...
Page 53: ...52 P a g e ...
Page 54: ...53 P a g e ...