13 |
P a g e
STEP 2.7
BACK GABLE ASSEMBLY
2.7 - ASSEMBLY PARTS
–
GABLE ASSEMBLY
PART CODE QTY
DESCRIPTION
G
4
Gable (2 pairs)
65HHS
6
65mm Hex head screw
FGS
1
Front gable cover strip
SCS
1
Stilla branded cover strip
40N
10
40mm Nail
DH
1
Door head
2.7
- ASSEMBLY
–
GABLE ASSEMBLY
Lay both gable pairs on a flat surface with frame upwards. Hold flush at the bottom and
screw together using 2 x 65HHS in centre stud. (Image 1)
Turn one gable over. Position (SCS) Stilla branded cover strip flush with bottom cedar board
and flush on each end. Nail through cover strip into gable using 40N. (Image 2)
Position (FGS) front gable cover strip over join in front gable. Fasten in position using 40N.
(Image 3)
Hold DH (Door head) Perfectly centre of base plate on gable, screw down through gable
bottom plate into door head using 2 x 65HHS
1
2
3