20 |
P a g e
STEP 3.5
ROOF INSTALLATION
3.5 - ASSEMBLY PARTS
–
ROOF INSTALLATION
PART CODE QTY
DESCRIPTION
2
Completed roof panels
65HHS
6
65mm Hex head screw
3.5 - ASSEMBLY
–
ROOF INSTALLATION
Slide roof panel into position and fasten up through front and back gables. Ensure roof
rafters are flush with gables. Fasten up through side wall top plates at each end and each
panel join. Ensure walls run parallel with bottom batten (BB) on roof.
(Repeat this step for
both roof panels)
STEP 3.6
COLLAR TIE INSTALLATION
3.6
–
ASSEMBLY
–
COLLAR TIE INSTALLATION
PART CODE QTY
DESCRIPTION
CT
1
Collar tie
65HHS
2
65mm Hex head screw
3.6 - ASSEMBLY PARTS
–
COLLAR TIE INSTALLATION
Holding Collar tie tight and level in position screw through CT into Roof Rafter.
CT
Screw