37 |
P a g e
STEP 6.4
6.4 - ASSEMBLY PARTS
–
FIXING TO BASE
PART CODE QTY
DESCRIPTION
65HHS
10
65mm Hex Head Screw
6.4 - ASSEMBLY
–
FIXING TO BASE
Once shed is in desired position and doors are sitting evenly you can now fix your shed to
the base. Fix either side of Double Doors, at each corner and at each join of panel. It is
recommended that fixings are every 1200mm. Screws/Dyna bolts are to be fastened
through the bottom plate. If going on a concrete slab, fasteners are not supplied.
Summary of Contents for Hazel 9x6
Page 43: ...42 P a g e ...
Page 46: ...45 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 47: ...46 P a g e ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...
Page 51: ...50 P a g e ...
Page 52: ...51 P a g e ...
Page 53: ...52 P a g e ...
Page 54: ...53 P a g e ...