5 |
P a g e
STEP 2.0
WALL ASSEMBLY
Ensure tongue on VJ Cedar Cladding is facing upwards.
2.0 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
BP
1
1500mm Back panel
SP
1
1500mm Side panel
65HHS
2
65mm Hex head screw
2.0 - ASSEMBLY
–
WALL ASSEMBLY
Screw through BP into SP at top and bottom. Holding studs flush on the inside.
Note: Window panel can go either side.
STEP 2.1
WALL ASSEMBLY
2.1 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
WP
1
1500mm Window panel - peel protective cover off Perspex windows
65HHS
2
65mm Hex head screw
2.1 - ASSEMBLY
–
WALL ASSEMBLY
Screw through BP into WP at top and bottom, holding studs flush on the inside.
BP
SP
BP
SP
BP
WP
Summary of Contents for Hideout S2011
Page 23: ...22 P a g e ...