38 |
P a g e
STEP 6.3
LEAN TO / ANNEX
6.3 - ASSEMBLY PARTS
–
LEAN TO / ANNEX
PART CODE QTY
DESCRIPTION
VP
2
Verandah posts
100BS
4
100mm batten screw
65HHS
4
65mm hex head screw
6.3 - ASSEMBLY
–
LEAN TO / ANNEX
Using at least 3 people, butt the verandah roof hard up under shed roof as shown in
picture. Support front of verandah roof while fastening through frame into shed wall
studs using 4 x 100BS.
Cut post to correct length. (Ensure there is fall down to front of verandah roof)
Once posts are in place and front beam is level right across, screw through front beam
into posts using 2 x 65HHS per post. (no fasteners are supplied for base of post
–
they can
either be set in the ground with concrete or dyna bolted onto flat concrete using a
bracket)
Summary of Contents for Oxford
Page 42: ...41 P a g e ...
Page 43: ...42 P a g e ...