background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

State: 11/2012 · S. 2

Mounting instructions for seesaw „libra4“ 

Item No. 512512101 / 512512401

Diagram 2: Side view with dimension details „libra4“

Play level

Floor anchor

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: 6100 x 2800mm). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment.

 

Regarding to DIN 1176 - 4.2.8.2.5, impact absorbing surfaces have to be put 
under the whole impact area of every equipment with an enforced movement.

3.  Carry out excavation work for the foundation anchor as shown in Diagram 2. 

After excavation, compress the foundation floor.

 

Note: 

The seesaw is built in on the play level. Pay attention to items marked 

„game level“ of play equipment! 

4.  Set up the concrete foundation acc. to the dimensions indicated (LxWxH 800 

x 800 x 500 mm) with central, horizontal reinforcement (BST 500 S) in the 
quality class C 20/25. Make sure that the foundation anchor included in the 
delivery is cast into the foundation in such a way that the upper angle frame 
lies horizontally and fl ush mount with the surface of the foundation.

Reinforcement plan: 

Concrete foundation with rein-

forcement
Main foundation: BSt 500S

 

Ever 4 stirrups Ø 8 mm lengthwise and cross

 

Concrete cover h´= 3 cm
Concrete quality class C 20/25

marking installation depth

Reviews: