5
4) Insert the staves, with the previously installed stoppers, between the uprights and the beams, as shown in the
figure.
5) After all staves have been inserted, install the closing frame using the self-locking screws.
NOTE: If the boiler has upper connections it is necessary to install the special central covers, as shown in the fig-
ure. If that’s not the case, completely cover with staves the upper part and close the boiler with the side frames.
Summary of Contents for REX F
Page 1: ...TECHNICAL MANUAL REX REX F REX K REX K F REX DUAL REX DUAL F PRESSURISED STEEL BOILERS...
Page 2: ......
Page 18: ...18 1 2 6 3 4 5 9...
Page 30: ......
Page 32: ...ASSEMBLY INSTRUCTIONS STAVES LINING...
Page 33: ......