- 14 -
OPERATION
65CMED & 95CMED
BEFORE STARTING
Mixers are shipped completely assembled and ready
for operation except for installation of the safety chain.
SAFETY CHAIN INSTALLATION
- Remove the
safety chain kit from the engine compartment. The kit
includes (1) 12 ft. length of safety chain and (2)
connecting links. Pull one end of the chain through the
(2) key hole slots located in the front post of the mixer
with a hook (see drawing below and decal on mixer
front post). Attach the connecting links to each end of
the chain. Follow the instructions in the TOWING
section of this manual and on the mixer front post to
attach the safety chain to the towing vehicle.
INSTALLING CHAIN TO MIXER
OIL LEVELS AND LUBRICATION
- Be sure to
check the oil levels in the engine and engine reduction
unit BEFORE starting this unit. The engine warranty is
VOID
if it is run without oil. Consult the ENGINE
MANUAL supplied with this unit for specific
instructions and oil recommendations.
Also check the trunnion bearings to make sure they
have been greased. Consult the Lubrication Section of
the manual for the specific instructions if greasing is
required.
BEFORE WORKING ON MACHINE, MAKE
SURE ENGINE SPARK PLUG WIRE IS
DISCONNECTED, OR, IF ELECTRIC, THAT
THE ELECTRIC CORD IS DISCONNECTED, TO
PREVENT ANY ACCIDENTAL STARTING.
HARDWARE
- Check all hardware on mixer and
engine / motor before starting. Consult the TORQUE
CHART section of this manual and tighten any loose
hardware accordingly. Loose hardware will contribute
to early component failure and poor performance.
FUEL
- If your mixer is equipped with a gasoline
engine, fill the gas tank with clean gasoline from a
safety can. Consult the ENGINE MANUAL supplied
with this unit for the proper type of gasoline required.
DO NOT
mix oil with gasoline.
FOLLOW THE GUIDELINES FOUND IN THE
SAFETY PRECAUTION SECTION OF THIS
MANUAL WHENEVER HANDLING GASOLINE.
TO START THE ENGINE/MOTOR
COLD START
- Open the fuel valve under the gas
tank all the way. Open the throttle approximately half
way and apply the choke. Pull the starter rope sharply.
If the engine doesn't start after (3) pulls, open choke
slightly to prevent flooding. When the engine starts,
open the choke and adjust the throttle as necessary to
keep it running. Allow the engine to warm up for a few
minutes before placing it under the load. Always
operate the engine at full throttle when under load.
HOT START
- Open the valve under the gas tank all
the way if it has been shut off. Open the throttle
approximately half way. Do not apply the choke. Pull
the starter rope sharply until the engine starts. When
the engine starts, adjust the throttle. Always operate
the engine at full throttle when under load. Adjust
engine speed so drum is turning between 20 - 25 RPM.
NOTE:
These starting instructions are general
guidelines only. Since many engine options are
available on the manufacturer's CMED mixers, consult
the ENGINE MANUAL included with this unit for
specific instructions.
WARNING
WARNING
Summary of Contents for 65CMED
Page 2: ......