866-795-1586 • WWW.STONEAGETOOLS.COM
10
2” BADGER TOOL SERVICE INFORMATION
ASSEMBLY:
1. Apply 2-4 drops of BA 185 Red Loctite
®
262
around the circumference of the threads on
the Replacement Head prior to screwing it
into the Shaft.
2. Care must be taken NOT to allow Red
Loctite
®
into the internal shaft bore below
the female threads or onto the tapered
external surface of the shaft.
3. Slip the Removal Tool between the Head and
the Body and clamp it into a vise.
4. Insert the WV 181 Spanner Wrench into the
Shaft.
5. Using a 7/8” socket wrench, torque to 100
in-lbs
6. Install the Inlet Nut into the Shaft.
7. Always replace the Retaining Ring with a
new one during each reassembly.
8. Finally, install the O-Ring.
BA 182
Head
Removal Tool
4
3
WV 181
Spanner
Wrench
Shaft
Clamp
in Vise
O-Ring
Retaining
Ring
Inlet
Nut
8
7
6
Clamp
in Vise
Red
Loctite
®
2
1
5
Clamp
in Vise
7/8” Torque
Wrench