10
Unpacking the Appliance
U n p a c k i n g t h e A p p l i a n c e
Inspect the box the appliance was shipped in and note if it was
damaged in any way. If the appliance itself shows damage, file a damage
claim with the carrier who delivered it. Confirm that the Stonesoft anti-
tamper tape on the appliance is intact.
R a c k - M o u n t i n g
This section provides information on installing the StoneGate appliance
into a rack unit.
Caution –
Read the
Safety Precautions
, on page 6 before proceeding.
Preparing for Rack-Mounting
The appliance delivery includes two sets of rail assemblies, two sets of
rail-mounting brackets, and screws for attaching the rails and the
brackets.
Caution –
Read the sections below before you begin the installation.
Choosing a Setup Location
Decide on a suitable location for the rack unit that will hold the
appliance:
• The appliance must be situated in a clean, dust-free area that is well
ventilated.
• Avoid areas where heat, electrical noise and electromagnetic fields
are generated.
• Leave enough clearance in front of the rack to enable you to open the
front door completely (~63 cm/25 inches).
• Leave enough clearance in the back of the rack to allow for sufficient
airflow and ease in servicing (~76 cm/30 inches).
Rack Precautions
• Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
• In single rack installation, attach stabilizers to the rack.
• In multiple rack installations, couple the racks together.