EK–SMCPP–UG. A01
5–1
5
Replacing Components
This chapter describes the procedures to remove and install the field replaceable units
(FRUs) in the RAID Array 7000 Departmental Storage Cabinet. The FRUs are listed and
shown in the last section of the chapter.
5.1
Replacing a Controller or Cache Module
5.1.1 Tools Required
You need the following tools to remove or replace the controller module:
•
ESD (ElectroStatic Discharge) strap
•
Small blade screwdriver for trilink and external cache battery cable fasteners
5.1.2 Precautions
In general, you should follow routine ESD protection procedures when handling
controller modules and cache modules and when working around the cabinet and
shelf that houses the modules.
Follow these guidelines to further minimize ESD problems:
•
Use ESD wrist straps, antistatic bags, and grounded ESD mats when
handling controllers and cache modules
•
Obtain and wear an ESD wrist strap on your wrist. Make sure the strap fits
snugly.
•
Attach the lead on the ESD strap to a convenient cabinet grounding point.
•
After removing a module from the shelf, place the module into an approved
antistatic bag or onto a grounded antistatic mat.
•
Remain grounded while installing a replacement module.
CAUTION
Follow program card guidelines or damage to the
program card and controller software can result.