If you choose to vary from these instructions
your warranty will be impaired.
1
Components checklist
Please check the parts carefully and advise immediately if any are damaged or missing.
Building your shed
The basic task is to join the sheets together to
form your panels, and fit the channels to the top
and bottom of these panels. They will then join
together to form your shed (diagram 1, 2 and 3).
Pan
Rib
Important
•
Remove the swarf (drill filings) from
the panels as you assemble them.
• All components are cut to length. Do
not cut any parts unless instructed.
• Fixings through the inside of the
channels into the sheeting are just
as important as fixings from the
outside.
Ribs and Pans
•
Generally most fixings are spaced at
300mm apart.
•
Keep the fixings in the pans as close to
the ribs as possible for added strength.
• Ribs will always protrude to the outside
of the shed.
•
Extra internal fixings are strongly
recommended in high wind areas.
If you need advice, call us FREE on 0800 807 433
or email us at info@storite.co.nz
2 x 1770 x 780mm
(door sheet.)
2 x narrow 1830
x 715mm sheets
(Beside
door)
4 x 1830 x 780mm
(back wall)
8 x 1770mm x 780mm
sheets (roof)
8 x gable angle cut
sheets & 2 centre gable
cut
1/2
half sheets
(end walls)
8 x 3000mm “U”
channels (front,
back and
roof.)
2 x 3285mm (bottom)
& 2 x 3330mm (top)
“U” channels
(side walls.)
4 x 1770mm “U”
channels
(door sides.)
2 x 1586mm “U”
channels (door
spacers).
4 x 780mm “U”
channels (door
top and
bottom).
4 x 1770mm “L”
flashings (roof
to side
flashings).
2 x 1830mm & 1 x
1770mm “Z”
door jambs.
(front)
2 x 310mm door plate.
1 x pack screws with
3 padbolt. 1 x pack of
rivets and hinges.
2x door bracing.
1 x 3030mm long
ridge beam (roof)
4 x Gable plates 2 small
& 2 large (end walls)
A
B
C
D
E
F
G
J
M
H
K
N
I
L
O
P
Q
diagram 1
diagram 2
diagram 3