30
X8
57L
X2
- With 30 (X8),
screw 57L (X 2) into G
- Avec 30 (X8),
visser 57L (X 2) dans G
- Con 30 (X8),
atornillar 57L (X 2) en G
30
X8
57R
X2
- With 30 (X8),
screw 57R (X 2) into H
- Avec 30 (X8),
visser 57R (X 2) dans H
- Con 30 (X8),
atornillar 57R (X 2) en H
8
G
57L
57L
30
30
30
30
UP
7
Step 1
, install drawer
track using locator holes.
Step 2
, install remaining
screws no pre drilled holes.
Step 1
, install drawer
track using locator holes.
Step 2
, install remaining
screws no pre drilled holes.
30
30
57L
G
UP
57R
H
UP
30
30
Required/Requis/Requerido
Required/Requis/Requerido
UP
30
30
30
30
57R
57R
H
30
30
Step 2
Step 2
Step 1
Step 1
30
30
57R x 2
57L x 2
30
30
Step 1
Step 1
Step 2
Step 2
30
30
ASSEMBLY INSTRUCTIONS / INSTRUCTIONS D'ASSEMBLAGE /
INSTRUCCIONES DE ENSAMBLAJE
1
3