9.
Assemble the tee section to the tailpiece, overflow, & drain ell using the coupling nuts and O-rings
that are provided.
O Ring
Overflow Ell
Tee
Coupling Nut
10 .
Attach the tapered rubber gasket to the overflow ell. Align the overflow ell with the overflow hole &
secure the drain to the tub with overflow plate and screw provided.
11 .
Run water into the bath and check the bath drain connections for leaks. Seal the connection between
the bath rim and the finished tiled wall using silicone sealant.
Tapered Rubber Gasket
Overflow Plate