Page 16
23/03/01
ASSEMBLY INSTRUCTIONS FOR: Ca 7s / BCa 7s
K2B Connections
Supply 230V / 50Hz
K2B Electrical Connections
*
Legend
1.
Instrument Control Panel.
2.
Separate Calorifier Control.
4.
Separate Calorifier Circulating Pump.
9.
Boiler Shunt Pump.
26.
Flue Gas Damper.
28.
Safety Solenoid Valve.
29.
High Limit Thermostat.
30.
Calorifier Control Thermostat.
DIN 4791 - Weiland Connector
(7-way for stage 1 burner operation).
DIN 4791 - Additional Weiland Connector.
(4-way for use with Hi/Low Burners).
A.
Power Supply 230V / 50Hz
B.
Burner Connections. (Plug and Socket Looms).
K.
Boiler Circulating Pump Interlock.
W.
Flue Gas Damper Interlock.
X.
Safety Solenoid Valve Interlock.
Y.
Calorifier Thermostat Interlock.
Z. Provision for Remote High Temperature Limit
Indication.
D1. Calorifier Instrument Control Panel Connection.
D2. Calorifier Circulating Pump Connection.
* Provision for Remote Switching of Burner.
(terminals 8a & 8b).