30
USER MANUAL FOR INDEPENDENT PELLET FIRED BOILERS
SUPPLEMENTARY OPERATING INSTRUCTIONS FOR THE UK MARKET
TO BE READ IN CONJUNCTION WITH THOSE IN THE INSTRUCTION BOOKLET
WARNING NOTE
Properly installed, operated and maintained this Boiler will not emit fumes into the dwelling. Occasional
fumes from de ashing and re fuelling may occur. However, persistent fume emission is potentially danger-
ous and must not be tolerated. If fume emission does persist, then the following immediate action should be
taken:
(a)
Open doors and windows to ventilate the room and then leave the premises.
(b)
Let the fire go out.
(c)
Check for flue or chimney blockage and clean if required
(d)
Do not attempt to relight the fire until the cause of the fume emission has been identified and corrected.
If necessary seek expert advice.
The most common cause of fume emission is a flueway or chimney blockage. For your own safety these
must be kept clean at all times.
General
Before lighting the boiler check with the installer that the installation work and commissioning checks
described above have been carried out correctly and that the chimney has been swept clean, is sound
and free from any obstructions. As part of the boilers’ commissioning and handover the installer should
have shown you how to operate the boiler correctly.
Do not light the boiler if there is a possibility that any part of the heating system may be frozen
Please make sure that the ash
-
pit door, Boiler flue and combustion chamber doors, the hopper lid/
charging door and flue cleaning doors are firmly closed at all times whilst the boiler is in operation.
CO Alarm
Your installer should have fitted a CO alarm in the same room as the appliance. If the alarm sounds un-
expectedly, follow the instructions given under “Warning Note” above.
Boiler Access
Access to the boiler should be restricted for children, aged and/or infirm persons by way of a lockable
door to the room in which the boiler is installed.
Chimney cleaning
The chimney should be swept at least twice a year. It is important that the flue connection and chimney are
swept prior to lighting up after a prolonged shutdown period. Where the chimney is believed to have a
served an open fire installation it is possible that the higher flue gas temperature from a flue sealed appli-
ance may loosen deposits that were previously firmly adhered, with the consequent risk of flue blockage. It
is therefore recommended that the chimney be swept a second time within a month of regular use after
installation.
READ THE INSTRUCTION BOOK AND
THESE INSTRUCTIONS
CAREFULLY BEFORE USING THE BOILER