104
17.4 Mounting Condensate Trap
When mounting the bottom part of the condensate trap, before commissioning the boiler and/or after maintenance,
it must
ALWAYS
be completely filled with water.
This is a safety measure: the water in the condensate trap keeps the flue gases
from leaking out of the heat exchanger via the condensate drain.
When the boiler receives a heat demand the electronics will start the operation of the boiler. Before the boiler is
used, the boiler must be adjusted and set at the minimum and maximum load.
17.5 Checking gas pressure
Check the gas pressure available at the gas connection pipe of the boiler. Use the pressure nipple [3] of the gas
safety valve for this measurement. In chapter 18.1.2 the position of the pressure nipple [3] is shown.
Min. and max. gas supply pressures:
17.6 Firing for the first time
After the commissioning of the boiler and the
described previous actions, the boiler display will
show this screen.
This screen is active during power up and will remain active until communication with the main Control has been
established.
After communication has been established one of the following Status overview screens appears:
The display describes:
•
The actual operation for heating or hot water
•
The temperature setting
Type of Gas
p nom [mbar]
p min [mbar]
p max [mbar]
G20
20
17
25
G25.3
25
20
30
G31
37
25
57.5
WARNING
The condensate trap must always
be filled to the edge with water,
before replacing to the unit.
WARNING
Central Heating only
Central Heating AND Domestic Hot Water
OR
Summary of Contents for S-CBX 105
Page 2: ......
Page 40: ...40 9 10 Flue Terminal Positioning ...
Page 42: ...42 9 11 1 FIGURE 12 LINE G ...
Page 55: ...55 11 5 Ladder Logic Diagram ...
Page 56: ...56 11 6 Electrical schematics ...
Page 57: ...57 ...
Page 137: ......