78
3.2 Boiler status
min. max. Default unit
Access
level
Description:
Flow Temperature
°C
User
Actual supply flow temperature
Flow 2 Temperature
°C
User
Actual supply 2 flow temperature
Return Temperature
DHW Temperature
°C
User
Actual DHW temperature
DCW Temperature
°C
User
Actual DCW temperature
Outside Temperature
°C
User
Actual outside temperature
Flue Temp
°C
User
Actual flue gas temperature
Flue 2 Temp
°C
User
Actual flue gas 2 temperature
System Temperature
°C
User
Actual system temperature
0-10 V Input
Flowrate
l/min
User
Actual DHW flowrate
RT Input
open/clos
User
Actual RT input status
Water Pressure
Bar
User
Actual CH water pressure
Fan Speed
Ionization
uA
User
Actual ionization current
State
User
Actual burner state
Error
#
User
Actual internal error code
Calculated Setpoint
°C
User
Actual CH setpoint
3.3 Boiler history
min.
max.
Default
unit
Access
level
Description:
Successful Ignitions
#
User
Display the number of
successful ignitions
Failed Ignitions
#
User
Display the number of failed
ignitions
Flame Failures
#
User
Display the number of flame
losses
Operation Days
days.
User
Display the total time in
operation
CH Burner Hours
hrs.
User
Display the amount of burn
hours for CH
DHW Burner Hours
hrs.
User
Display the amount of burn
hours for DHW
3.4 Error Log
min.
max.
Default
unit
Access
level
Description:
Error Log
User
Display the complete error log
Filter Error Type
User
Set the error log filter
Clear Error Log
Installer Clear the complete error log
3.5 Service
min.
max.
Default
unit
Access
level
Description:
Service history
User
Display the service history
Burn hours since last
service
hrs.
User
Display the burn hours since last
service
Burn hours till service
hrs.
User
Display the hours remaining until
next service
Operation Days
days.
User
Display the total time in
operation
4 Settings
min.
max.
Default
unit
Access
level
Description:
4.1 General Settings
User
Enter the General Settings menu
4.2 Boiler Settings
User
Enter the Boiler Settings menu
Summary of Contents for S-CBX 105
Page 2: ......
Page 40: ...40 9 10 Flue Terminal Positioning ...
Page 42: ...42 9 11 1 FIGURE 12 LINE G ...
Page 55: ...55 11 5 Ladder Logic Diagram ...
Page 56: ...56 11 6 Electrical schematics ...
Page 57: ...57 ...
Page 137: ......