9
BA_170-22D_A14_180704_en
3
3.1
Installation and putting into service
Strobel machines are supplied either as complete units with head, stand and
motor, or head with compact-motor only, or the head only.
Unpacking the machine
Due to the high weight and to avoid damages during transport, complete units
are packed in several smaller cartons.
Machine head and motor are removed from the stand (Machine head and
motor are removed from the stand) (except the compact motor).
Reel stand, rods, oil and other accessories are packed into the stand packing.
Make sure that all accessories have been unpacked before throwing away any
packing material.
3.2
Installation
A T T E N T I O N !
Danger of bodily injuries or finger bruises through pulling in
of garments or hairs!
The machine may not be operated without belt guards for
head and motor.
If the machine head is supplied without stand and motor first make the borings
into the table top as shown in the drawing. Mount rods and treadles and electric
connections according to the connecting diagram.
Mount the motor. Electric connection as per connecting diagram shown in the
motor's operating instructions.
Mount the head with the rubber sheet (1) to the table top according to fig. 1
using 3 screws (2) and 3 washers (3).
Mount the V-belt and tense it according to “3.4.1 Tensioning the V-belt”.
Mount the belt guard.
Mount the lifting and motor operating rods as shown in Fig. 1.
Using a compact motor means to assemble the controlbox and speed controller
under the table. Also the operating rod between speed controller and pedal has
to be connected.
Summary of Contents for 170-22D
Page 4: ......
Page 5: ...1 BA_170 22D_A14_180704_en ...
Page 6: ...2 BA_170 22D_A14_180704_en ...
Page 29: ...25 BA_170 22D_A14_180704_en Fig 10 ...
Page 40: ......