background image

© 2018 Strong

TM

 

SR-WMS Wall Mount Series

Fully Assembled Rack with Swing & Door

Package Contents

A. Fully Assembled Rack (1)
B. 5/16” Lag Bolts and Washers (4)
C. Mounting Template (1)
D. Keys - Front Door (2) & Swing/Side Panel (2)
E. #10-32 Rack Screws (40)
F. Door Shim Washers (3)

Key Features

• Full kit (rack swing and glass door included)
• Arrives fully assembled
• Universal hinges (number of hinges may vary by rack

height)

• Wire management (knock out on top of rack and swing

allows for ample room to manage cable)

• Front door, side panels, and swing are lockable
• Rails are labeled with U units for ease of arrangement
• EIA 310-D hole pattern
• Easily add fans for additional cooling (not included)
• Reversible door and swing

To  ground  cabinet,  connect  the  ground  wire  to 

the 

f

ield  wiring  ground  terminal  on  the  bottom  panel

 

f

irst. 

Then  connect  bonding  wires  from  grounded 

frame  to  bonding  terminals  on  main  chassis,  side 

panels  and  doors. 

To  ground, 

  or  bond 

use  UL 

Listed  closed 

loop  connectors  with  minimum  12 

AWG  wire  1/4”  zinc  plated  steel  or  stainless  steel 

internal  tooth  washer,  and  an  M6  nut.

  If grounding  and 

bonding  is  not  completed  in installation,  then  all  parts 

are  considered  not effectively grounded or bonded.

Reversing Front Door Swing

Tools required:

 #2 Phillips Screwdriver

1. Open the door and pull the hinge pins free, then slide the door out of the rack. (Fig. 1)
2. Move the grommet in the bottom hinge hole to the opposite side. (Fig. 2)
3. Flip the door and attach it to the opposite side of the rack (latch will be upside down). (Fig. 1)
4. Remove the door latch screw and bracket, rotate the outer handle 180°, then reassemble. (Fig. 3A)
5. Remove the locking latch screw and rotate the latch 180°, then reassemble. (Fig. 3B)

Fig. 3

A

B

Fig. 2

Fig. 1

Reviews: