Version 1
35
3. MONTHLY MAINTENANCE
Check the tightening of all bolts &screws
Check hydraulic connections and hoses for leakage and tighten the loose unions, if
necessary.
Check the greasing and mechanical wear condition of chains, pins, rollers, and sliding blocks
of carriage structure and if necessary, replace the damaged parts.
Check steel ropes for damage, crush or flattened.
Check the tension of steel rope to avoid being loose.
Check steel ropes sheaves for mechanical wear and ensure no displacement.
Check steel chain tension and its fixing pins to the lift structure.
4. YEARLY MAINTENANCE (BY SKILLED PERSONS ONLY)
Lower down the platform on the floor and turn off the main electric switch.
Empty the oil tank and check the condition of the hydraulic fluid. Clean the oil filter from
impurities and change oil if needed.
Check the electric control box components and make sure all wiring is connected tighten.
Check all electric cables to ensure neither burns nor bare wires.
Clean by blower and dry brush the electric motor to remove accumulated dust which prevents
good heat exchange.
Check the chains & wire ropes, if there is any mechanical wear, breakage or damage and
change it if needed.
If the above maintenance operations are carried out, there will be an advantage for the user who will
find the equipment in perfect condition each time he restarts work.
3. Service lift of main parts
1. Steel structure: 10 years
2. Chain : 10 years
3. Cylinder: 5 years
4. Power unit :5 years
5. Electric parts: 5 years
Summary of Contents for Telford
Page 1: ...Version 1 1 INSTALLATION MANUAL OPERATION INSTRUCTIONS SINGLE POST CAR PARKING LIFT ...
Page 7: ...Version 1 7 WARNING SIGNS ...
Page 8: ...Version 1 8 Fig 2 Fig 3 ...
Page 11: ...Version 1 11 4 4 Lift Dimensions ...
Page 20: ...Version 1 20 Fig 13 Fig 14 Fig15 Fig16 ...
Page 21: ...Version 1 21 Fig 17 Fig 18 Fig 19 ...
Page 24: ...Version 1 24 Fig 24 Fig 25 ...
Page 25: ...Version 1 25 Lock device in the post Fig 26 Fig 27 ...
Page 26: ...Version 1 26 Fig 28 ...
Page 31: ...Version 1 31 Operation box and remote control ...
Page 32: ...Version 1 32 OPERATION STEPS OF OPERATION PANEL CONTROL PANEL ...
Page 38: ...Version 1 38 9 2 HYDRAULIC DIAGRAM ...
Page 44: ...Version 1 44 NOTES ...