14
TECHNICAL PASSPORT, INSTALLATION AND MAINTENANCE INSTRUCTION
6.3
Connection diagram of
„Stropuva“ boiler to another boiler, water
heater, radiator, floor heating
Figure 12
1. Triple D25
- 13 pcs.
16. Three directional distribution valve
- 1 pcs.
2. Triple D25 x D15
- 3 pcs.
17. Threaded tip DN2 25
- 3 pcs.
3.
Elbow D25 V/V
- 2 pcs.
18. Filling valve
i/i 1/2“
- 1 pcs.
4. Elbow D25 V/i
- 2 pcs.
19. Release valve 1/2
- 1 pcs.
5. Nipple D25
- 17 pcs.
20.
Brass disc valve V/V
1“
- 2 pcs.
6. Adapter D25 x D15
- 3 pcs.
21.
Adapter D32 x D25
- 2 pcs.
7. Circulation pump installation
kit D25
- 1 pcs.
22.
Thermostatic valve
- 1 pcs.
8. Separable connection D25 V/i
- 2 pcs.
23. Valve 1,5 bar
- 1 pcs.
9. Automatic bleeding device
- 1 pcs.
F
- to/out of floor heating
10. Balance valve D25 V/i
- 1 pcs.
B
- to/out of water tank
.
11. Horizontal monometer
1/4“
- 1 pcs.
K2
- to/out of other boilers
12. Adapter
D15 x 1/4“
- 1 pcs.
R
- to/out of radiator
.
13. Ball valve
V/i 1“
- 3 pcs.
14. Circulation pump
- 1 pcs.
.
15. Thermostatic head 20 - 50 °C
- 2 pcs.
For boilers S7, S10, S12, S20, S7 BIO, S10 BIO, S20 BIO and S10U, S12U, S20U, nodes are
assembled from parts D20. For boilers S30, S30 BIO and S30U, S40, S40 BIO and S40U nodes
are assembled from parts D25.