BM33
Rubber Track Shoe Kit
RS58
Parts & Fastener List
001641sfp
Channel
(58)
001642
Rubber Shoe
(58)
N
5/16-18x1 1/4 Carriage Bolt
(174)
HH
5/16-18 Spin Lock Nut
(174)
NOTE:
To clarify the assembly procedure, the
following Photos show the Rubber Track
Shoe being installed on the
rear end
of the
Track.
Actual assembly should be done
on
top
of Track Plate where you can easily
tighten Nuts from below.
STEP 1.
Insert a #1642 Rubber
Shoe
into
a #1641 Channel. Align the three
(3) 3/8” holes in #1642 Rubber Shoe with
mating
three (3) 3/8” holes in #1641 Chan-
nel and then with the
mating
three (3) 3/8”
holes in Track Plate.
From above, insert a #N Bolt into
each series of mated 3/8” holes. From
below Track Plate, secure each Bolt with a
#HH Nut.
NOTE:
Tighten each #N Bolt until its
“head” is drawn
below
surface of
outer
face
of #1642 Rubber Shoe.
STEP 2.
Follow this procedure,
moving Track periodically, until all 29 Rub-
ber Shoes and Channels of each Track
have been installed and firmly tightened.
“Head” of #N Bolts
pulled below
surface of #1642 Rubber Shoe.
Sample after tightening Bolts
1641 Channel
1642 Rubber Shoe
1641
N
HH
1642
Track
Plate