background image

INSTALLATION: REMOVAL FROM SKID / POSITIONING & ALIGNING UNITS/ GLASS SHELVING 

1.  Remove Case From Skid (Levelers) 

 



Remove shipping brace that may be 
securing case to skid. 



Support case to prevent tipping. 



Caution!  Levelers can be damaged if case 
hits floor with heavy force! 

Case can be repositioned with pallet truck when 
front lower panel is removed.  Blocking may be 
necessary to obtain adequate height.   

Slide Skid Out 



Carefully slide unit to 
rear of skid and tip 
backward off skid.  

 



Illustration may not 
reflect every feature 
or option of your 
particular case.

 

2.   Remove Case From Skid (Casters)

 

 

Remove shipping brackets that may be securing 
casters to skid 



Place ramp up against skid (to allow case to 
smoothly slide off from skid). 



Maintain support of case at all times or center 
of gravity may cause case to fall.  



Unlock Casters.  Roll unit to rear of skid.   

Ramp 

Roll down ramp 
and off from skid. 

Support 
while 
rolling 
case 
down 
ramp. 

Note: Illustrations 

shown reflect a general 

outline of  sample cases 

and do not reflect 

features or options of 

your particular model.

 

3.  Position and Aligning Units 

Position Units.  Align multiple units carefully 
in areas A & B shown below. 

4. Glass Shelving 

 

Glass shelving will be packed separately.  

 



Caution!  Carefully remove from packaging. 



Grasp firmly and carefully install. 



Caution!  Check that plastic edging is intact   
before placing glass shelving onto brackets! 



Plastic edging must NOT be removed from 
glass shelves.  Contact Structural Concepts for      
replacement edging (see 

TECHNICAL       

SERVICE CONTACT INFORMATION 

section). 



Check that glass shelving is in proper position 
before placing product in case. 

Glass 

Shelves 

(Typical) 

Summary of Contents for Harmony HMG2653

Page 1: ...FRIGERATED CASES 33 DEEP SERVICE NON REFRIGERATED HMG L 53 PLEASE NOTE THE FOLLOWING 1 YOUR SPECIFIC MODEL NUMBER IS ON THE SERIAL LABEL ON CASE REAR NEAR MAIN POWER SWITCH 2 SEE MODELS AND THEIR RESP...

Page 2: ...ITS CASTERS ADJUSTING FRONT TOE KICK INSTALLATION FIELD WIRING CONNECTIONS FOR VARIOUS MODELS INSTALLATION FRONT GLASS ALIGNMENT ADJUSTMENT INSTALLATION DISPLAY CASE START UP INSTALLATION RAISING THE...

Page 3: ...ensions Note 3 If your specific model is not found contact technical service phone number is listed at Technical Service section in this manual for dimensions Note 4 CDRs Customer Design Requests are...

Page 4: ...CE This equipment MUST be installed in compliance with all applicable NEC federal state and local electrical and plumbing codes CAUTION CAUTION Fluorescent lamps have been treated to resist breakage a...

Page 5: ...d Maintain support of case at all times or center of gravity may cause case to fall Unlock Casters Roll unit to rear of skid Ramp Roll down ramp and off from skid Support while rolling case down ramp...

Page 6: ...of the 5 to 8 bolts in a cross wise pattern Work your way around the pattern tightening more firmly at each pass Do not firmly tighten one bolt and then start on the next H After the cases are bolted...

Page 7: ...from slot empty and replace See cleaning schedule for specifics on cleaning D Collapsible Rear Ledge When not in use lift up and allow support rod to collapse Lower ledge downward Reverse this procedu...

Page 8: ...ram Each case has its own wiring diagram folded and in its own packet Wiring diagram placement may vary it may be placed near condenser fan cover ballast box raceway cover or other related location 11...

Page 9: ...trip PVC Wireway HMG2653R Only Ballasts 13 Field Wiring Connections HMG7553 Field wiring connection junction box is at case rear underside See illustration below Single phase leads are provided Option...

Page 10: ...compromise the environment inside the case and may create condensation Follow the five steps listed below to assure proper front glass alignment 2 Front to Back Leveling Place a level on top of case p...

Page 11: ...r See illustrations below All lights should come on at same time First Light Switch time lighting may require a short warm up period for the bulbs Slightly dim or a flickering of new bulbs is normal T...

Page 12: ...nal position See illustration below View of Rear Doors being lifted up pivoted out and away from case View of Curved Glass being raised 18 Removing the Rear Doors Note Optional Swinging Door are on HM...

Page 13: ...llation of lamp Align pins with slot Insert pins into socket by rotating the bulb 1 4 turn to secure either the upper or lower pinned contacts into the sockets Rotate the remaining bulb contacts 1 4 t...

Page 14: ...ations at right 2 Plug and Cord Positioning Plug is to connect to LED light at raceway side of case Before attaching LED light to case verify that plug connects to LED properly without cord doubling b...

Page 15: ...with a household or commercial cleaner X Vacuum under case to remove all dust and dirt that may collect under case Clean Case Interior X Glass shelves can be cleaned with a household or commercial gla...

Page 16: ...orm this task Confirm that unit has been field wired correctly Caution Only a certified electrician is to perform this task Case Lights Not Working Check that ALL lights are plugged in and or receptac...

Page 17: ...ions on contacting Structural Concepts Technical Service Department See images below for samples of both refrigerated and non refrigerated serial labels Sample Serial Label For Non Refrigerated Case S...

Page 18: ...defined herein suffered or incurred by SCC as a result of or in connection with any act omission or use of the Goods by Purchaser its employees or customers or any breach of this Agreement by Purchas...

Reviews: