© STULZ GmbH, Hamburg
EN / 10-2015 / 1000683
-
57
-
STULZUltraSonic-SystemforDirectRoomHumidificationBNB-
Start-up
8.
Start-up
All steps from section "7. Installation" on page 33 must have been completed prior to start-up.
CAUTION
Electrical connections are secure.
After transport/delivery, check that electrical connections are secure and re-tighten if necessary.
WARNING
CAUTION
No obstacles in the blow-out area.
There must not be any obstacles in the blow-out area of the unit. Risk of condensation!
NOTICE
CAUTION
Stationary water in pipes.
Donotoperatethehumidifierwithstationarywaterinthepipes.
NOTICE
CAUTION
Alignment with airflow.
Alignthehumidifierinthedirectionoftheairflow.
NOTICE
CAUTION
Water and power supply.
Makesuretheultrasonichumidifierissuppliedwithelectricalpoweranddemineralizedwater.
NOTICE
CAUTION
Space for maintenance and repair work.
CAUTION
Check all connections.
Route and connect all power cables and water supply pipes correctly, securely and safely.
NOTICE
CAUTION
Operation
<
0°C.
Donotoperatethehumidifieriftheroomtemperaturedropsbelow0°C!
●
Drain the water tank of the unit.
NOTICE