2.1 Installation
.
When the Power Cord is connected with normal utility power,
UPS will turn ON automatically and goes through the procedure
of self test. If test results are O.K., the LED will blink in green
color indicating that the mains is available and UPS starts battery
charging. UPS output will be available only when front power
switch is pressed for few seconds (LED glows continuously when
O/P is ON)
Inspect the Carton Box for any damage that may have
occurred while in transit. Immediately notify the carrier and
place of purchase if there is any damage . Retain the package for
future use.
Connect the power cord to a verified grounded 3-wire receptacle.
For connecting your equipment to the UPS and to ensure that
your computer equipment will be protected during a utility
failure, it is important to make sure that the maximum power
need of the equipment is not over the rated capacity of the UPS
2.2 Operation
REV. 05-02-08
Installation
&
Operation
(5)
Sine Wave LI UPS
2. Installation and Operation
2. Installation and Operation