background image

Hard Wall Aluminium Sukkah - 2x3m

Assembly Instructions  

 

Door Beams and Panels

 

(put these aside for your door)

Hinge Beams 

(2 beams joined together with hinges)

 - 1

Handle Beam

 (beam with handle and latch on)

 - 1

Hook Beam 

(beam with hook for latch on) 

- 1

Door Crossbeams 

(white sticker)

 - 3

Under Door Support Bracket 

(pink sticker)

 -1

White Panel with red sticker 

(top panel)

 -1

White Panel with green sticker 

(bottom panel)

 -1

The basic Sukkah kit is 2x3 Meters with a door and a window. Any size larger than this 
will come with separate 'extension' kits of 2 x 1 running meters or 2 x 2 running meters.

VERY IMPORTANT

The beams and panels are different sizes and it is crucial that you use the correct 
beams and panels in the correct places. The beams and panels are marked with 
colour stickers and it is essential that you follow this guide.

Supporting Beams 

(install once Sukkah is up)

2 Meter Crossbeam 

(pink sticker)

 - 2

1 Meter Crossbeam 

(pink sticker)

 - 2

500cm Top Corner Support 

(pink sticker)

 - 4

300cm Anchoring Bracket 

(pink sticker)

 - 2

Tie Down/ Wall Fixing Adapter - 4

 

Cross Beam Joiner 

(pink sticker) 

- 0

Other Beams in Kit

4-slot Upright Beam 

(green sticker) 

- 4

2-slot Upright Beams

 (black sticker)

 - 4

2 Meter Crossbeam 

(blue sticker) 

- 4

1 Meter Crossbeam 

(yellow sticker)

 - 10

2 Meter Crossbeam

 (grey sticker)

 - 4

1 Meter Crossbeam 

(grey sticker)

 - 2

White Panel 

(with orange sticker) 

- 17

Clear panel 

(with orange sticker)

 - 1

Basic Sukkah Kit 2x3 Contents

2

Summary of Contents for Hard Wall Aluminium 2x3m

Page 1: ...NING Please read before use 3 Wherever you place your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may c...

Page 2: ...ms and panels are different sizes and it is crucial that you use the correct beams and panels in the correct places The beams and panels are marked with colour stickers and it is essential that you fo...

Page 3: ...put these aside for your door Hinge Beams 2 beams joined together with hinges 1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Suk...

Page 4: ...tool to turn the bolt The lock will lock the beam in place To build a 2x3 Sukkah Step 1 Start with the bottom and upright beams first NB Ensure that both sides of the hinges are facing outwards as in...

Page 5: ...st row of panels into the slots Pic 2 2 slot upright Pic 1 Panel going in On a 2 meter wall use a 2 slot upright beam between the two panels NB Panels are not exactly square Make sure you insert the p...

Page 6: ...he red sticker and another 1 meter crossbeam Step 3 Place a crossbeam on top of the panel insert a second panel on top of the crossbeam and close the top off with a 1 or 2 meter crossbeam Leave a gap...

Page 7: ...2m x 3m ARIAL VIEW 5 0 c m 3m 2m Step 6 Place top supports ontop of your Sukkah for added strength Pink Stickers...

Page 8: ...Place a sandbag or heavy item ontop of foot Sandbag over a foot Use Rings to fix to wall or tie down Upright Pole Foot 8 Step 7 Use remaining supports to anchor your sukkah...

Reviews: