background image

Step 4

 – To complete the door, place the white panel with the green sticker 

at the bottom, a 1 meter crossbeam on top of it, followed by the white panel 
with the red sticker and another 1 meter crossbeam.

Step 3

 – Place a crossbeam on top 

of the panel, insert a second 
panel on top of the crossbeam 
and close the top off with a 
1 or 2 meter crossbeam. 
Leave a gap for your window.

Door Closed

Door Open

6

Step 5

 – Place the window in whichever panel you want it to be.

Under Door Support Bracket  

Under Door Support Bracket  

Summary of Contents for Hard Wall Aluminium 3x4m

Page 1: ...NING Please read before use 3 Wherever you place your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may c...

Page 2: ...1 Handle Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Under Door Support Bracket pink sticker 1 White Panel with red sticker top panel...

Page 3: ...Beam beam with handle and latch on 1 Hook Beam beam with hook for latch on 1 Door Crossbeams white sticker 3 Sukkah Elements Door do NOT construct these yet 3 How the beams join together Inset the lo...

Page 4: ...1 Start with the bottom and upright beams first NB Ensure that both sides of the hinges are facing outwards as in this picture Under Door Support Bracket Unscrew foot to attach Under Door Support Bra...

Page 5: ...st row of panels into the slots Pic 2 2 slot upright Pic 1 Panel going in On a 2 meter wall use a 2 slot upright beam between the two panels NB Panels are not exactly square Make sure you insert the p...

Page 6: ...he red sticker and another 1 meter crossbeam Step 3 Place a crossbeam on top of the panel insert a second panel on top of the crossbeam and close the top off with a 1 or 2 meter crossbeam Leave a gap...

Page 7: ...3m x 4m ARIAL VIEW Step 6 Place top supports ontop of your Sukkah for added strength Pink Stickers 7 5 0 c m 4m 1m 1m 1m Joiner 4 x 4 cm 1m 3m 2m 1m...

Page 8: ...Place a sandbag or heavy item ontop of foot Sandbag over a foot Use Rings to fix to wall or tie down Upright Pole Foot 8 Step 7 Use remaining supports to anchor your sukkah...

Reviews: