background image

1

1

Unravel the material and place around your 
frame. Ensure that the door is in the correct 
position.
Fold and fasten the velcro around the top 
poles.
Do the same around the base poles.
Fasten all the velcro strips around the middle 
poles.

Take the black straps and secure one around 
onecorner pole. Bring it around the pole and
across to the next vertical pole and slip it 
through the grooves on the pole.

Continue around your sukkah and secure it 
aroundthe last corner pole with the velcro. 
Repeat this forall three straps.

Note:

 - Ensure that these straps are pulled 

taut.

This will make your sukkah kosher 
l’mehadrin.

Your sukkah is now complete!

STEP 2

STEP 3

7

7

10

10

12

12

15

15

3

4

You can now roll on your Permanent 

Schach and decorate your Sukkah!

For more help and instruction videos, 

visit our website

www.sukkahmart.co.uk.

8

14

Super Sukkah 3 x 4m 

Assembly Instructions

Summary of Contents for Super Sukkah

Page 1: ...e your Sukkah it is vital that you anchor your Sukkah down so that it cannot lift off the ground If wind lifts the Sukkah off the ground the Sukkah may collapse upon landing This is especially importa...

Page 2: ...dle x2 Joiner for Top Middle x2 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x3 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 2 Super Sukkah 3 x 4m Assembly Parts Quantity of...

Page 3: ...r and middle joiners No 12 and No 13 to the corner and middle poles No 1 and No 2 Join together the horizontal top poles No 3 and No 4 and then connect these poles to the top corner joiners No 12 and...

Page 4: ...the next vertical pole and slip it through the grooves on the pole Continue around your sukkah and secure it aroundthe last corner pole with the velcro Repeat this forall three straps Note Ensure tha...

Page 5: ...orner x4 Joiner for Top Corner x4 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x1 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 5 Super Sukkah 2 x 3m Assembly Parts Quantity o...

Page 6: ...ase Corner x4 Joiner for Top Corner x4 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x4 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 6 Super Sukkah 3 x 3m Assembly Parts Quant...

Page 7: ...Joiner for Top Middle x2 Lavud Straps x3 Material Covering x1 1m Horizontal Pole for Top x7 Joins with No 3 1 2 3 5 6 7 9 8 10 12 11 13 14 15 4 7 Super Sukkah 3 x 6m Assembly Parts Quantity of items f...