SULLIVAN-PALATEK______________________________
7
1.8 LIFTING
Lift or move the compressor only with equipment of sufficient load capacity that has
been inspected and is in good condition.
Keep personnel out from under and away from the area when lifting or moving the
compressor.
Lift no higher than necessary. Carry as low as possible when moving.
Keep lifting operator in attendance whenever compressor is suspended.
Set compressor down only on level surface capable of supporting several times the
machine weight.
Do not lift entire machine by motor lifting eyes, as they are intended only for lifting the
motor.
1.9
AUTOMATIC START AND/OR RESTART
Do not assume that any air compressor is ready for maintenance, service, or trouble-
shooting if it is not running. It may be in the “Automatic-Start” mode “Sleep” mode, or
was not shut down properly prior to power having been shut off, and then when power is
re-applied the compressor may suddenly re-start, thereby creating a hazardous
condition! Also, compressor may be wired to BLT or sequencer which might call for a
start.
Close discharge air valves and shut off machine. Open main disconnect; lock it out and
tag it to prevent others from inadvertently re-closing it.
1.10 NOISE
Working near an open-air compressor, or an enclosed machine with doors and/or
access panels open or removed, can prove hazardous even during short-term exposure.
The noise may interfere with hearing verbal warnings or other sounds of impending
dangers.
WARNING: For prolonged exposure to machinery noise, hearing protection is
recommended and may be required by OSHA.
Summary of Contents for 125G
Page 12: ...______________________________SULLIVAN PALATEK 12 CONTROL SCHEMATIC ...
Page 18: ...______________________________SULLIVAN PALATEK 18 4 5b WIRING DIAGRAM Y DELTA START OPTIONAL ...
Page 28: ...______________________________SULLIVAN PALATEK 28 PARTS LISTING ...
Page 31: ...SULLIVAN PALATEK______________________________ 31 DRIVE AND BASE ASSEMBLY ...
Page 32: ...______________________________SULLIVAN PALATEK 32 7 3 DRIVE AND BASE ASSEMBLY PARTS LIST ...
Page 33: ...SULLIVAN PALATEK______________________________ 33 LUBRICATION AND COOLING SYSTEM AIR COOLED ...
Page 37: ...SULLIVAN PALATEK______________________________ 37 LUBRICATION COOLING SYSTEM W C 200 250 ...
Page 38: ...______________________________SULLIVAN PALATEK 38 7 5b LUBRICATION COOLING SYSTEM W C 200 250 ...
Page 39: ...SULLIVAN PALATEK______________________________ 39 INLET AND CAPACITY CONTROL SYSTEM ...
Page 41: ...SULLIVAN PALATEK______________________________ 41 DISCHARGE SYSTEM 125 150 HP ...
Page 43: ...SULLIVAN PALATEK______________________________ 43 DISCHARGE SYSTEM 200 250 HP ...
Page 45: ...SULLIVAN PALATEK______________________________ 45 OPEN COMPRESSOR ELECTRICAL CONTROL PARTS ...
Page 47: ...SULLIVAN PALATEK______________________________ 47 ENCLOSED COMPRESSOR CONTROL PARTS ...
Page 48: ...______________________________SULLIVAN PALATEK 48 7 8b ENCLOSED COMPRESSOR CONTROL PARTS ...
Page 49: ...SULLIVAN PALATEK______________________________ 49 AIR COOLED ENCLOSURE 125 250 ...
Page 50: ...______________________________SULLIVAN PALATEK 50 7 10a AIR COOLED ENCLOSURE 125 150 ...
Page 51: ...SULLIVAN PALATEK______________________________ 51 AIR COOLED ENCLOSURE 200 250 ...
Page 52: ...______________________________SULLIVAN PALATEK 52 7 10b AIR COOLED ENCLOSURE 200 250 ...
Page 53: ...SULLIVAN PALATEK______________________________ 53 WATER COOLED ENCLOSURE ...
Page 54: ...______________________________SULLIVAN PALATEK 54 7 11 WATER COOLED ENCLOSURE ...
Page 56: ...______________________________SULLIVAN PALATEK 56 7 12b DECAL AND IDENTIFICATION ...