Operations performed
Overall check of the tower
Cleaning of the tower
Collecting basin cleaning and flushing
Cleaning of the filter
Cleaning of the coil (outside)
Substituting the coil
Cleaning of the nozzles
Substituting the nozzles
Cleaning of the drift eliminator
Substituting the drift eliminator
Checking of the operation of the filling valve
Checking and cleaning of the float valve
Contr
ol of the voltage and curr
ent of the fan electric motor
Checking of the motor fastening
Contr
ol of oil level in r
educer (if fitted)
Cleaning of fan blades
Check fastening of the fan
Check angle of fan blades
Regulation angle of fan blades
Contr
ol of the voltage and curr
ent of the pump motor
Substituting the pump
Check water tightness in secondary cir
cuit connections
Substituting the secondary cir
cuit pipe
Check operation and flow rate of dischar
ge
Cleaning of louvers
Cleaning of the sensor
Remarks
Date
ST
AMP
Rev
. 1
Rev
. 2
Rev
. 3
Rev
. 4
Rev
. 5
Rev
. 6
Rev
. 7
Rev
. 8
Rev
. 9
Rev
. 10
Rev
. 11
Rev
. 12
MAINTENANCE CONTROL OF COOLING TOWERS
Customer:
Serial number: