The 6x8 Greenhouse 185 – Summer Greenhouses
ASSEMBLING THE SIDES
Side cill showing
Identify the parts to complete this section - each
side will contain:
1 x Side cill
3 x Glazing bars
1 x Gutter
2 x Side diagonal corner braces
Nuts and bolts
Layout roughly in the correct position on the
ground as shown in the diagram.
NOTE: Decide which side the staging and
shelving is going to be placed. Remember this
when pre-loading the extra bolts in both the
side and roof glazing bars and most importantly
when assembling.
One side of the greenhouse will carry the
staging and shelving, that side must be pre-
loaded with 3 extra bolts in the appropriate
glazing bars. The opposite side will carry only
1 extra pre-loaded bolt.
diagonal support
and glazing bar
holding three pre-
loaded bolts
Assemble sides in the same way as the previous
sections. Each glazing bar will be secured to the
cill with a nut and bolt and similarly to the
gutter bar. The diagonal support bars can then be
positioned, using the existing bolts. Once all is in
the correct positions tighten the nuts and
repeat the assembly for the other side.
At this point you must have help either as a
extra pair of hands or support/props.
Gutter
Glazing bars
Side Cill
º
Pre-loaded bolts for the staging side
10
Summer Greenhouses 0800 9777 828