The 6x8 Greenhouse 185 – Summer Greenhouses
Door assembly with door tracking
vent top rail
vent bottom rail
then fit the vent bottom rail using M6 x 10 bolts.
Finally check that the vent is square, now it can
be slid into position. Check that it functions and
the vent sits well and the latch can be secured on
the pins. If fine adjustments are required make
Fitting the Doors
Slide door wheels into top track, at the same time
ensuring the nylon door glide engages in the
door guide. Slide on completely and repeat
process for other door. Check that both doors run
freely, if not then check that the outer track is
sitting squarely on the inner track. Check that
door track is parallel to door guide.
When the doors are running to your satisfaction,
fit a rubber door stop to each end of the track in
the holes provided using M4 X l0mm stainless
steel nut, bolt and washer.
Check all fits and works.
Vents - Roof
Identify roof vent items and the casement stay
and assemble with the required pane of glass.
You will need to fix the casement stay before
assembling the frame (The slam pins will be fixed
to the vent slam bar).
Fit both side vent rails to the vent top hinge
using M6 x 10 bolts. Slide glass into place and
16
Summer Greenhouses 0800 9777 828
them. Once happy, secure the vent by using a
small ball of silicon at either end of the vent.
Final position of roof vent, with
casement stay and pins
Window casement stay