The 6x8 Greenhouse 185 – Summer Greenhouses
BROKEN GLASS ASSEMBLY PROCEDURE
Remember there is no need to rush if you are
Glass, occasionally gets broken in transit.
Whether you noted it on the carriers delivery
form or not, we will pay for its replacement
without argument.
You can buy a new sheet of toughened glass
from your local glazier and send the receipt to
the place of purchase. You will receive a refund
cheque within a few days.
There is no need to delay construction of the
greenhouse if you would prefer to continue.
Check that the replacement glass can be fitted
easily after the greenhouse is complete.
On pages 20-23 are glazing plans which give
sizes and positions for all your glass
requirements.
Double check the sizes before you order a
replacement piece of glass and remember to
order toughened safety glass.
Summer Greenhouses 0800 9777 828
assembling this building yourself. The assembly
procedure falls easily into six distinct stages:
A Siting the greenhouse and ensuring that the
base is right - if the base is level, flat and
square then the greenhouse will go up easily.
The base plan is detailed above for the 6x8. If
the greenhouse is being fitted on a brick,
concrete or timber base then 20mm should be
deducted off the overall external width and
length measurements. (eg 10mm each side).
This will prevent the rainwater going back into
the greenhouse.
B All glazing bars are to be fitted with the
rubber beading.
C Assembling the door end, plain end and side
structures.
D Assembling the roof structure.
E Glazing the complete greenhouse.
F Doors, Vents and finishing off
5