background image

 

1. Floor section                                                                                                          Summer Garden Buildings – Hipped Summerhouse 270 

Prepare a level area for the Summerhouse to sit. Lay the floor panels upside down and secure them together using 5 x 50mm screws per join as shown.  

Important note  

To "VALIDATE" the guarantee, adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building. 
Placing the building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions. If the 
building  is  to  sit  on  soil  or  grass  it  MUST  be  erected  on  pressure  treated  wooden  50mm  x  50mm  or  similar bearers (These are not supplied in the kit). We 
recommend using pressure treated bearers with all buildings on any type of base.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50mm 

50mm 

 

 

 

 

 

 

 

 

 

2.Wall panels  

Position a back panel and a side panel on the floor as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge. Ensure square and 
secure using 3 x 50mm screws, screw through the frame of the side panel into the frame of the back panel. Position the small back panel next to the first, ensure level and secure 
them together using 3 x 50mm screws, screw through the frame of the second panel into the frame of the first. Continue adding the rest of the panels as shown in the 
diagrams using 3 x 50mm screws per join.  

It is recommended to drill pilot holes with a 

3mm 

3mm drill bit for all screws in this section. 

Drill 

 
 
 
 
 
 
 
 

50mm  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Back panels 
 
 

Side panel 

Back panel 

 
 
 
 
 
 
 
 
 

50mm 

 
 
 
 
 
 

Panel frames 

Panel cladding 

rest on floor. 

overhangs floor 

Front panels 

edge. 

 

For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828

Summary of Contents for Hipped Summerhouse 270

Page 1: ...eading strips 1775x9x9mm 2 27 Door glazing 284x306mm 12 28 Side window glazing 193x304mm 18 29 Front window glazing 200x304mm 6 30 Beading 306mm 72 31 Beading 252mm 24 32 Beading 106mm 48 33 Large side roof felt 2 31 x1m 2 Hipped Summerhouse 270 Assembly Instructions x 2 Caution Drill This product contains glass Wear protective Gloves work gloves while handling these components Recommended tools f...

Page 2: ... all buildings on any type of base 50mm 50mm 2 Wall panels Position a back panel and a side panel on the floor as shown Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge Ensure square and secure using 3 x 50mm screws screw through the frame of the side panel into the frame of the back panel Position the small back panel next to the first ensure level and...

Page 3: ...anels to allow the doors to shut properly then fully tighten the screws to lock the position 4 uring the walls to the floor 25mm Ensure the walls are sitting square on the floor and front panels is 1730mm Sec nels down using 2 x 63mm screws per panel screwing through the panel framing and floor and floor into the floor joists 63mm 63mm 1730mm 5 Roof panels into the floor joists For each front pane...

Page 4: ... block Position the roof centre block in the hole in the middle ensure it is flush with the roof panel framing and secure in place using 4 x 50mm screws Screw through the frames of the rectangular roof panels into the centre block as shown below Drill 4 holes in the roof inside cover piece centre the cover piece over the centre roof block and secure in place using 4 x 50mm screws screw through the...

Page 5: ...the distance between the front panels to allow the doors to shut properly then fully tighten the screws at the top of the front panels to lock the position Please refer to section 3 30mm 10 Door weatherstrips and beading To the right hand door position a weatherstrip over the join between the 2 doors and secure in place to the inner door only using 4 x 38mm screws Position a second weatherstrip in...

Page 6: ...screws per bolt With the doors shut drop the bolts at the bottom of the doors and mark where they touch the floor Drill a 12mm hole in the floor for each bolt to fit in 32mm 19mm 32mm 19mm 19mm 12mm Drill 19mm 12 Cover strips Fit a cover strip into each corner attach using 3 x 38mm nails per strip The 4 remaining cover strips are to cover the joins between panels 2 on the back and 1 on each side S...

Page 7: ...ure that the lower edge overlaps the large felt and the upper edge overhangs the roof centre block Once in position secure the lower edge with 5 x 10mm felt nails tension the felt and secure at the top edge with 2 x 10mm felt nails Fold the front and back edges over and secure each edge with 3 x 10mm felt nails Repeat for the other side panel 10mm 10mm Felt nails Felt nails 15 Front and back roof ...

Page 8: ...ptable provided that the building is not allowed to sit in pooled water during wet conditions If the building is to sit on soil or grass it MUST be erected on pressure treated wooden 50mm x 50mm or similar bearers These are not supplied in the kit We recommend using pressure treated bearers with all buildings on any type of base Timber Information As timber is a natural material there are certain ...

Reviews: