background image

           Rippa 

 

4.0m, 5.0m, 6.0m and 7.0m 

Folding  

 

 

Parts list 2008

 

and 

Operators Manual 

 
 
 
 
 

 

   

               

w

w

w

w

w

w

.

.

s

s

u

u

m

m

o

o

1

1

.

.

c

c

o

o

m

m

 

The Airfield 

Full Sutton 

York 

YO41 1HS 

Tel. 01759 371700 
Fax. 01759 371001

 

 

Summary of Contents for Rippa

Page 1: ...Rippa 4 0m 5 0m 6 0m and 7 0m Folding Parts list 2008 and Operators Manual w ww ww w s su um mo o1 1 c co om m The Airfield Full Sutton York YO41 1HS Tel 01759 371700 Fax 01759 371001...

Page 2: ...Ltd The Airfield Full Sutton York YO41 1HS Tel 01759 371700 Fax 01759 371001 SUMO SERIAL No For your own records Serial plate on side of headstock Rippa Registration Document NAME ADDRESS DATE SUMO SE...

Page 3: ...can also be used for primary cultivation post harvest and can work down to 14 16in to remove plough pan compaction Before using the SUMO Rippa it is absolutely necessary that you read this Operators m...

Page 4: ...5 4 0 Operation and Adjustment 5 4 1 Operating 6 4 2 Adjustments 6 5 0 Maintenance 7 5 1 Spares 7 5 2 Winter storage 7 6 0 Parts and Assembly 8 6 1 Overview 8 6 2 Point Assembly 9 6 3 Leg Shear Bolt A...

Page 5: ...ed Make sure that only authorized personnel work on or with the machine Define the machine operators responsibilities also with regard to observing traffic regulations The operator must have the autho...

Page 6: ...to account the wide overhang and or the sideways force acting on the machine when turning or negotiating curves Ensure that the wings are locked in the upright position when moving down the road by mo...

Page 7: ...on the machine Also the tractor engine must be turned off with the parking brake applied In order to change the points it is first necessary to remove the two nuts and bolts behind the leg freeing the...

Page 8: ...riod correct storage techniques are an important part of protecting the machine to ensuring a hassle free season When the machine has finished work it should be cleaned down and washed off to remove a...

Page 9: ...8 6 0 Parts and Assembly 6 1 Overview Item Description Page 1 Point Assembly 9 2 Leg Shear bolt Assembly 10 3 Depth Control 11 4 Wheel Assembly 12 5 Main Frame 13 3 2 1 4 5...

Page 10: ...uantity 5 m machine Quantity 6 m machine Quantity 7 m machine 1 SW195 Rippa Point 15 19 23 27 2 SW271 Rippa leg 15 19 23 27 3 SWM12003 M12 plain nut 30 38 46 54 4 SWM1265PB M12x65 plough bolt short 15...

Page 11: ...y 7m machine 1 SWM20100 M20 x 100 bolt 15 19 23 27 2 SWM2090SB Rippa Shear Bolt 15 19 23 27 3 SWM20004 M20 nylock nut 30 38 46 54 4 SWM20001 M20 flat washer 30 38 46 54 5 SWM24004 M24 nylock nut 15 19...

Page 12: ...ine Quantity 7m machine 1 SW274 Rippa wheel depth frame 2 2 4 4 2 SW275 Rippa wheel long pivot pin 2 2 4 4 3 SWM1240 M12x40 bolt 2 2 4 4 4 SWM12003 M12 plain nut 2 2 4 4 5 SW276 Rippa depth pin 4 4 8...

Page 13: ...el 2 2 4 4 2 SWB151 Rippa 5 stud hub unbraked complete 2 2 4 4 3 SWB153 Rippa wheel studs 2 2 4 4 4 SW585 Ripper LH steel depth wheel arm 1 1 2 2 SW586 Ripper LH steel depth wheel arm not shown 1 1 2...

Page 14: ...N A N A SW281 6m Rippa right wing N A N A 1 N A SW282 7m Rippa right wing N A N A N A 1 7 SW284 50 x 165 tabbed pin 4 4 4 4 8 SWM1650 M16x50 bolt 4 4 4 4 9 SWM16004 M16 nylock nut 4 4 4 4 10 SWB107 Ca...

Page 15: ...14 6 7 Stickers and Paint RIPPA RIPPA 7 5 Rippa Sticker 154...

Page 16: ...k head to quick coupler 2 4 SWH143 banjo bolt 4 5 SWH142 dowty washer 8 6 SWH132 706 4 ram 2 7 SWH156 12L Tee branch 2 8 SWH203 3 8 Hyd hose tee to ram ports 4 9 SWH204 Hyd hose bulk head to tee 2 10...

Reviews:

Related manuals for Rippa