2-10
Sun Enterprise 6500/5500/4500 Systems Installation Guide • August 2001
3. Connect the terminal power cord into an AC wall outlet.
4. Configure the ASCII terminal as follows:
■
9600 bps
■
1 stop bit
■
8 data bits
■
Parity off
■
Full duplex
Refer to the instruction manual shipped with the terminal for specific configuration
instructions.
Note –
The setup parameters listed in Step 4 may differ from the setup at the
customer site. These parameters can be changed in the NVRAM. Refer to the s
et-
defaults
and
printenv
commands in the OpenBoot Command Reference manual,
part number 802-3242.
2.7
Connecting the Fiber Cable to the I/O+
Board
1. Remove the two plastic caps that cover the cable connector on the GBIC module.
2. Remove the single plastic cap covering the ends of the fiber cable.
3. Connect the fiber cable to the GBIC module installed on the I/O+ board.
Align the notch in the cable connector (
FIGURE 2-10
) with the key notch in the module
connector.
4. Connect the other end of the fiber cable to the GBIC connector on the rear panel
of the SPARCstorage™ Array (or other storage device with fiber optics interface).
Align the notch in the cable connector with the notch in the connector on the storage
device rear panel.
Summary of Contents for 5500
Page 6: ...vi Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Page 10: ...x Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Page 16: ...xvi Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Page 46: ...2 14 Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...
Page 76: ...Index 4 Sun Enterprise 6500 5500 4500 Systems Installation Guide August 2001 ...