1-8
Power Distribution System Installation Guide • November 2002
4. Repeat the process for the second power sequencer.
5. Reinstall the rack side panel.
6. Apply the provided labels “A” and “B” to their respective sequencers.
Power Cable Labels
1. Note the power strip outlet number for each system connected to the power strip.
2. At the system end of each power cable, apply the appropriate adhesive label from
the label set provided.
Summary of Contents for 816-7766-10
Page 4: ...iv Power Distribution System Installation Guide November 2002...
Page 29: ...4 1 4 Sun Rack 3 4 1 4 6 4 7 3 1 B A B...
Page 30: ...4 2 2002 11 1...
Page 31: ...4 4 3 2 4 1 3 A 2...
Page 32: ...4 4 2002 11 4 2 4 2 B 2 1 A B 2...
Page 33: ...4 4 5 5 2 8 mm 4 3 6...
Page 34: ...4 6 2002 11 B A B 4 4 1 2 B B 5 3 4 5 A 2 4 6 A B...
Page 35: ...4 4 7 4 5 1 3 A0 B0 A1 B1 5 2 3 2 4 2...
Page 36: ...4 8 2002 11 5 6 A B 1 2...
Page 37: ...5 1 5 Sun Rack 5 1 5 6 5 7 B A B...
Page 38: ...5 2 2002 11 1...
Page 39: ...5 5 3 2 5 1 3 A 2...
Page 40: ...5 4 2002 11 4 5 2 B A B...
Page 41: ...5 5 5 5 8mm 5 3 6...
Page 42: ...5 6 2002 11 B A 5 4 1 2 B B 5 V 5 3 4 5 2 4 A 6 A B...
Page 43: ...5 5 7 5 5 1 A0 B0 A1 B1 5 2 3 4 5 6 A B...
Page 44: ...5 8 2002 11 1 2...
Page 45: ...6 1 6 Sun 6 1 6 6 6 7 B A B...
Page 46: ...6 2 2002 11 1...
Page 47: ...6 6 3 2 6 1 3 A 2...
Page 48: ...6 4 2002 11 4 6 2 B A B...
Page 49: ...6 6 5 5 8 6 3 6...
Page 50: ...6 6 2002 11 B A 6 4 1 2 B B 3 4 5 A 2 4 6 A B...
Page 51: ...6 6 7 6 5 1 A0 B0 A1 B1 2 3 4 5 6 A B...
Page 52: ...6 8 2002 11 1 2...
Page 53: ...7 1 7 Sun 7 1 7 6 7 7 B A B...
Page 54: ...7 2 2002 11 1...
Page 55: ...7 7 3 2 7 1 3 2 A...
Page 56: ...7 4 2002 11 4 7 2 B A B...
Page 57: ...7 7 5 5 8 7 3 6...
Page 58: ...7 6 2002 11 B A 7 4 1 2 B B 3 4 5 2 4 A 6 A B...
Page 59: ...7 7 7 7 5 1 A0 B0 A1 B1 2 3 4 5 6 A B...
Page 60: ...7 8 2002 11 1 2...