4.10 FINAL CHECK OF ASSEMBLED LIFT
1.
Final dimension check after anchoring.
____
2.
Check for air and hydraulic leaks.
____
3.
Ensure cables are properly routed and free from obstructions.
____
4.
Ensure all safety lock mechanism are working correctly.
____
5.
Re-check level of post and decks.
____
6.
Makes sure ramps are secured correctly with cotter pins ____
and washers.
7.
Check all fasteners, tighten if necessary.
____
8.
Check direction of flow control (arrow pointed toward power unit). ____
9.
If jack beams are supplied, ensure keeper bracket are installed. ____
10.
Check jam nuts on cables and safety ladders are tightened.
____
11.
Ensure cable flange clamp is installed correctly and tighten.
____
12.
Ensure cylinder shaft Jam Nuts are installed as per instructions. ____
13.
Ensure wheelstops are installed.
____
14.
Ensure wheel chocks are provided.
____
15.
Operate lift to full stroke then lower to ground while checking
____
for proper functionality.
16.
Ensure Customer Care Kit is complete and given to operator.
____
a. Operation Manual
____
b. ANSI / ALI Lift It Right Manual
____
c. ANSI / ALI Safety Tip Card
____
d. ANSI / ALI ALIS Safety Requirements for Installation
____
and Service of Automotive Lifts
e. ANSI / ALI Quick Reference Guide
____
17.
Train end user on operation of the lift.
____
Summary of Contents for ALIGNMENT EELR124A
Page 8: ...8 of 42 TYPICAL BAY LAYOUT ...
Page 23: ...23 of 42 6 0 SAFETY AWARENESS AUTOMOTIVE LIFT INSTITUTE ALI ...
Page 25: ...25 of 42 8 0 PARTS LIST 8 1 LIFT ASSEMBLY ...
Page 27: ...27 of 42 8 3 TOWER ASSEMBLY ...
Page 29: ...29 of 42 8 5 DECK ASSEMBLY LEFT SIDE ...
Page 31: ...31 of 42 8 7 CROSSMEMBER ASSEMBLY ...
Page 33: ...33 of 42 8 9 CYLINDER ASSEMBLY ...
Page 35: ...35 of 42 8 11 HYDRAULIC AND AIR KIT ...
Page 37: ...37 of 42 8 13 CABLE ROUTING ...