7.0 RECOMMENDED MAINTENANCE
DAILY
1.
Check general operation of lift.
2.
Check operations of mechanical safety locks.
3.
Check operation of air release valve for air leaks.
4.
Check operation of cables and pulleys.
5.
Check and drain water trap filter bowl.
MONTHLY
1.
Check anchor bolts (if loose re-torque to 150 ft. lbs.). Replace concrete if
anchors continue to loosen.
2.
Check all air and hydraulic hoses, fittings and cylinders for leaks.
3.
Check level of oil in power pack reservoir when lift is in the lowered
position. Add if required.
4.
Check lifting cables for wear, separation or breaks. If found, replace cables
immediately. Lubricate cables with oil or a light grease.
5.
Check and adjust cables if lifting is uneven. Make adjustments with weight on
lift.
6.
Check all fasteners and tighten as required.
7.
Check all pulleys on crossmember assembly and under the runways for
wear or play. Replace immediately. Pulley pins are held in place by a 3/8” -
16
×
1” lg. Hex Hd Bolt. Make certain that this bolt is in position and tight.
8.
Check and adjust safety racks if lift is not level on safety, or if safeties do
not engage properly.
9.
Check and clean full floating rear steer plates. Lubricate with oil or light
grease.
10.
Lubricate all safety shoes and locks.
QUARTERLY SLIP PLATE MAINTENANCE
1. Remove top Slip Plate covers by first removing the four (4) shoulder bolts
on each cover.
2. Remove polyethylene bearing cages insuring that all the delrin bearings
remain in the cages. Additional delrin bearings may be purchased if
required.
3. Clean runway surface and touch up any paint wear with a rust resistant
paint. Allow paint to dry thoroughly.
4. To obtain optimum performance, the position of the slip plate bearing cage
should be rotated every quarter to change the wear pattern. With the first
quarter maintenance, flip the bearing cage over to the opposite side. With
the second quarter maintenance, rotate the bearing cage end-to-end.
With the third quarter maintenance, flip bearing cage over to the opposite
side. Fourth quarter maintenance should see the bearing cage rotated back
to the original position.
5. Quarterly maintenance will optimize performance and contribute to longer
slip plate life.
Summary of Contents for ALIGNMENT EELR124A
Page 8: ...8 of 42 TYPICAL BAY LAYOUT ...
Page 23: ...23 of 42 6 0 SAFETY AWARENESS AUTOMOTIVE LIFT INSTITUTE ALI ...
Page 25: ...25 of 42 8 0 PARTS LIST 8 1 LIFT ASSEMBLY ...
Page 27: ...27 of 42 8 3 TOWER ASSEMBLY ...
Page 29: ...29 of 42 8 5 DECK ASSEMBLY LEFT SIDE ...
Page 31: ...31 of 42 8 7 CROSSMEMBER ASSEMBLY ...
Page 33: ...33 of 42 8 9 CYLINDER ASSEMBLY ...
Page 35: ...35 of 42 8 11 HYDRAULIC AND AIR KIT ...
Page 37: ...37 of 42 8 13 CABLE ROUTING ...