Note –
For the Sun Blade X6275 M2 with 1GbE (X6275M2–BB), each node has one
network port: the port for node 0 is assigned to a supported NEM in chassis slot NEM0,
the port for node 1 is assigned to an supported NEM in chassis slot NEM1.
For the Sun Blade X6275 M2 with 10GbE (X6275M2–CB), each node has one network
port: the port for node 0 is assigned to a supported NEM in chassis slot NEM0, the port
for node 1 is assigned to an supported NEM in chassis slot NEM1.
For information about installing chassis components, attaching cables, and powering on the
chassis, refer to the Sun Blade 6000 modular system chassis documentation at:
http://download.oracle.com/docs/cd/E19938-01/index.html
3. Choose a method for connecting to each node's Integrated Lights Out Manager (ILOM)
service processor (SP). These could include the following:
■
A network connection. You need a PC or workstation connected to the same network as
the SP.
■
A direct node SP connection using the serial management port of an optional multi-port
cable connected to the node's UCP connector on the server's front panel (refer to the
“Using the Multi-Port Cable” in
Sun Blade X6275 M2 Server Module Service Manual
for
details). You need a PC with terminal emulation software or ASCII terminal
workstation. A terminal server can also be used.
4. Choose a method for connecting to the host console (BIOS and OS). These could include
the following:
■
A network connection to the SP so that you can use ILOM to remotely redirect the host
console. You need a PC or workstation connected to the same network as the SP.
■
A direct host connection through the multi-port cable connector (VGA and USB). Refer
to the
“Using the Multi-Port Cable” in
Sun Blade X6275 M2 Server Module Service
for details.
Next Steps
■
“How to Install Your Server Module” on page 23
■
■
“Installing a Supported OS” on page 49
▼
How to Install Your Server Module
Perform all steps and fulfill all requirements in
“Installation Prerequisites” on page 22
Before You Begin
Installation Prerequisites
23