20
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
8. Transfer the top trim mount bracket from the chassis frame to the corner bracket.
Use the existing fasteners and tighten them fully (
Repeat this step on the opposite side of the chassis.
FIGURE 10
Power Shelf, Door, and Hardware Installation
9. Tighten all of the screws that were installed in Step 4, Step 5, Step 6, and Step 7.
Tighten the screws for the horizontal rails first then the screws for the trim plates
and trim angles to keep the structure square.
10. Tighten all of the screws that were installed in Step 1 and Step 2.