26
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
Verify the Cable Installation
Verify that the power and data cables are installed and connected correctly.
1. Make sure that the red (positive) power cables connect to the top (+) group of bus
box connectors.
2. Make sure that the black (negative) power cables connect to the bottom (-) group
of bus box connectors.
3. Make sure that all data cables are connected and tightened.