3
Installation Procedure
Pre-Installation Requirements
You must meet the following conditions for the successful installation of the dual
power option:
■
SSP version installed that supports dual power grid installation
■
Internal boot disks and other peripheral devices (except hub, AC sequencer, and
Remote Power Control Module (RPCM) Shelf) relocated to external cabinet
■
Five additional NEMA L6-30Rs (for North America) from another power source
available (four if no AC sequencer is installed)