38
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
9. Install the AC input power cable in the AC sequencer.
a. Route the cable down the chassis side wall.
b. Fasten the cable with the cable ties in the lanced loops of the chassis structure.
c. Fasten the cable at the bottom with a cable clamp using an available M4 tapped
hole (
).
Note –
The front and rear AC sequencers should not be connected to the same
power grid.
FIGURE 21
Equipment Installation in the Rear 4U Panel
Remote power
AC sequencer
RJ-45 connectors
Input power
Hub
Ground cable
control shelf
cable assembly