4-6
Sun Fire B1600 System Chassis Hardware Installation Guide • August 2003
4.1.2
Installing a Blade or Filler Panel
Note –
Operating the system chassis with empty blade slots might disrupt airflow
through the system chassis and will compromise EMC compliance.
Note –
Be aware that the system chassis contains three internal dividing walls.
Double-width blades must be installed in two available slots between these internal
dividing walls.
The steps below refer to installation of a single-width blade. The same steps apply
when installing a filler panel or double-width blade.
1. If required, open the blade lever by inserting a finger in the pull recess located in
lower portion of the blade lever and pull the lever in a forward and upward
motion, causing the lever to unlatch (
).
FIGURE 4-5
Blade Locking Mechanism
Pull recess
Summary of Contents for Sun Fire B1600 Administration
Page 6: ...vi Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 10: ...x Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 14: ...xiv Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 30: ...2 4 Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 82: ...5 14 Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 94: ...6 12 Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...
Page 98: ...Index 4 Sun Fire B1600 System Chassis Hardware Installation Guide August 2003 ...