Page 44
780 Series
9. Loosen hose clamp at bottom of CLEAR
RAY
® system and pull hose
off of CLEAR
RAY
fitting (twist the hose back and forth while pulling
downward). Tip hose down and allow to drain, then reinstall hose
and clamp. Remove the cover of the CLEAR
RAY
system to access
the UV bulb and quartz tube. Remove and store the UV bulb in a
safe location. Remove and dry off the quartz tube then reinstall it.
Depending on the length of time, consider replacing the UV bulb
when you resume use of your hot tub.
10. Re-install cabinet panel(s) and cover hot tub so that no casual
moisture can enter into it.
Consult your authorized Sundance dealer if you have any questions
regarding winter use or winterizing.
11.8 Restarting Your Spa in Cold Weather
If you want to start up your spa after it has sat empty for a time in
freezing temperatures, be aware that the water remaining in certain
sections of the piping may still be frozen. This situation will block water
flow preventing the spa from operating properly and possibly damaging
the equipment. We recommend you consult your dealer for guidance
before attempting to re-start your spa under these conditions.
Note:
To avoid any injuries, more than one individual must perform the
steps to remove the cabinet panel.
11.9 EZ Access Door
The EZ Access Door provides quick access to
the equipment bay and components without
having to unscrew the panel.
Note:
To avoid any injuries, at least two
people are needed to remove the cabinet
panel(s).
To remove the access door, follow the steps below:
1. Locate the EZ Access Door locking latches, on
the top corners of the front panel, Figure 11.9a.
2. Select one of the two door latches and press the
latch release button to unlocked, Figure 11.9b.
This will release the panel from its bracket and
the hot tub frame. Repeat the same steps for the
other latch.
3. Slowly and gently tilt the panel forward to remove. This will expose
the equipment bay for easy access to the components. Place the
panel in a safe location to prevent from damaging it.
4. To reinstall the panel just follow the steps above in reverse order.
11.10 Stainless Steel Maintenance
Parts in your Sundance hot tub are manufactured from a high quality
316 stainless steel alloy. Many people are familiar with the term
“stainless steel” and are surprised to learn that it does indeed rust and
Figure 11.9a
Figure 11.9b
Summary of Contents for 780 series
Page 1: ...Owner s manual P N 6530 607E Rev A 780 Series Hamilton Chelsee Bristol Hanover Montclair Dover...
Page 6: ......
Page 75: ......
Page 76: ......