11
When connecting the AP Smart component, it is
important to understand the limitations with the
PowerFit20 modules. No more than (6) modules
should be connected in series to one AP Smart
component. Doing any more will result in failure
of the PV system.
Figure 11. Shows the proper connections of the AP
Smart components using (1) AP Smart component
for each standing seam.