10
5
Unpacking and Storage
5.1
Scope of Delivery
Check the scope of delivery for completeness according to the packing list. The
following items should be included.
F
Fiig
gu
urre
e 5
5--1
1 Scope of delivery
IItte
em
m
D
De
essiig
gn
na
attiio
on
n
D
De
essc
crriip
pttiio
on
n
A
Logger1000
Logger1000
B
Documents
Quick User Manual, quality certificate, packing
list, product test report, and warranty card
C
Communication
terminal resistor
6x120Ω (Note: if there are more than 15
devices connected on the RS485 bus, it is
recommended to connect a 120Ω terminal
resistor in parallel on the A and B lines at the
head or tail end of the bus)
D
Nylon cable tie
Used to tie cables
E
Fastener assembly
4 sets, M4X16, used for wall-mounting to fasten
the device on the metal surface
F
Expansion bolt
4 sets, ST4.8X19, used for wall-mounting to
fasten the device on the concrete wall
G
Terminal fastener
2 sets, E/UK-1201442, fixed on the guide rail to
prevent the Logger1000 from moving
H
Guide rail
Length: 240mm